Do not remove manufacture labels on windows until the inspection approvals are given. In addition to the framing inspection, all insulation, windows, electrical, plumbing and heating systems must meet the energy requirements according to the energy calculations submitted with the approved plans. The framing inspection is to be performed after the roof framing, wall framing, fire blocking, wall bracing, doors, windows, flashings, attic / floor vents, and chimneys are complete. The electrical, plumbing and heating systems must be installed and approved prior to framing inspection. Moisture vapor barrier must be inspected for slabs prior to pouring concrete. Under floor insulation for raised foundations must be inspected prior to installing sub-floors. Under Floor Insulation or Vapor Barriers for Concrete Slab Any raised foundation systems must have the floor joist and girders inspected prior to installing floor sheathing. Also, required anchor bolts and steel reinforcements to be set in place prior to pouring concrete.Īny electrical or plumbing systems to be placed underneath concrete slabs, or beneath the wood floors must be inspected prior to placing cement or floor sheathing. Depending on the type and extent of the work, the following minimum inspections are required:įoundations inspections are to be performed after excavation for footings are complete, and all form boards are in place.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |